Pengaruh Perubahan Cuaca terhadap Penyiapan Kerja-Kerja Pembinaan di Tapak Bina

Authors

  • Haryati Shafii Jabatan Pengurusan Pembinaan, Fakulti Pengurusan Teknologi dan Perniagaan, Universiti Tun Hussein Onn Malaysia, 86400 Pt. Raja, Batu Pahat, Johor, Malaysia
  • Ezzer Harryson Stephen Jabatan Pengurusan Pembinaan, Fakulti Pengurusan Teknologi dan Perniagaan, Universiti Tun Hussein Onn Malaysia, 86400 Pt. Raja, Batu Pahat, Johor, Malaysia
  • Azlina Md Yassin Jabatan Pengurusan Harta Tanah, Fakulti Pengurusan Teknologi dan Perniagaan, Universiti Tun Hussein Onn Malaysia, 86400 Pt. Raja, Batu Pahat, Johor, Malaysia
  • Haidaliza Masram Jabatan Pengurusan Harta Tanah, Fakulti Pengurusan Teknologi dan Perniagaan, Universiti Tun Hussein Onn Malaysia, 86400 Pt. Raja, Batu Pahat, Johor, Malaysia
  • Ta Wee Seow Jabatan Pengurusan Pembinaan, Fakulti Pengurusan Teknologi dan Perniagaan, Universiti Tun Hussein Onn Malaysia, 86400 Pt. Raja, Batu Pahat, Johor, Malaysia
  • Mohd Hairy Ibrahim Jabatan Geografi dan Alam Sekitar, Fakulti Sains Kemanusiaan, Universiti Pendidikan Sultan Idris, 35900 Tanjong Malim, Perak, Malaysia

DOI:

https://doi.org/10.37134/geografi.vol11.1.6.2023

Keywords:

Perubahan Cuaca, Kerja pembinaan, Penjadualan projek, Penyiapan Kerja, Tapak Bina

Abstract

Pengaruh cuaca adalah salah satu faktor yang mengganggu penyiapan kerja-kerja pembinaan di tapak bina. Kesukaran dalam meramal cuaca boleh memberi kesan kepada projek binaan dan rangka kerja penjadualan projek serta menyebabkan penyiapan kerja menjadi lambat. Oleh itu, kajian ini dijalankan untuk mengenalpasti faktor cuaca yang mempengaruhi penyiapan kerja-kerja pembinaan dan kesan perubahan cuaca kepada penyiapan kerja-kerja pembinaan serta mengkaji tindakan yang boleh diambil bagi mengurangkan risiko pengaruh cuaca terhadap penyiapan kerja-kerja pembinaan di tapak bina. Skop kajian menumpukan kepada pengurus projek, penyelia tapak, dan jurutera di kawasan Kuala Lumpur. Data dikumpul melalui sesi temubual bersama dua orang pengurus projek, dua orang penyelia tapak dan dua orang jurutera yang terlibat dalam projek pembinaan. Dapatan kajian dianalisis menggunakan kaedah analisis tematik bagi mencapai objektif kajian. Hasil kajian menunjukkan bahawa hujan adalah cuaca yang paling mempengaruhi penyiapan kerja-kerja pembinaan dan boleh menyebabkan projek tergendala, mengganggu penjadualan projek dan kos binaan. Manakala untuk tindakan, pengetahuan am berkenaan trend cuaca semasa perlu dalam merangka penjadualan projek, penyimpanan bahan binaan dan jentera binaan yang baik dan peraturan keselamatan yang harus dipatuhi dan sebagai tindakan terbaik dalam mengurangkan risiko pengaruh cuaca dalam penyiapan kerja-kerja pembinaan di tapak bina. Diharapkan kajian ini dapat membantu pihak-pihak yang terlibat dalam sektor pembinaan untuk mengambil kira pengaruh cuaca tempatan dalam mengurangkan risiko dalam kerja-kerja pembinaan.

Downloads

Download data is not yet available.

References

Alshebani, M. N. & Wedawatta, G. (2014). "Making the construction industry resilient to extreme weather: lessons from construction in hot weather conditions." Procedia Economics and Finance, 18, 635-642.

Ballesteros-Pérez, P., del Campo-Hitschfeld, M. L., González-Naranjo, M. A., & González-Cruz, M. C. (2015). Climate and construction delays: case study in Chile. Engineering, construction and architectural management, 22(6), 596-621.

Ballesteros-Perez, P., Kabiri, S., Smith, S. T., & Hughes, W. (2016). Dealing with weather-related claims in construction contracts: A new approach. https://www.academia.edu/34599044/Dealing_with_weather_related_claims_in_construction_contracts_a_new_approach. Tarikh akses 31 Oktober 2023.

Ballesteros-Pérez, P., Rojas-Céspedes, Y. A., Hughes, W., Kabiri, S., Pellicer, E., Mora-Melià, D., & del CampoHitschfeld, M. L. (2017). Weather-wise: A weather-aware planning tool for improving construction productivity and dealing with claims. Automation in construction, 84, 81-95.

Daemei, A. B., Khotbehsara, E. M., Nobarani, E. M., & Bahrami, P. (2019). Study on wind aerodynamic and flow characteristics of triangular-shaped tall buildings and CFD simulation in order to assess drag coefficient. Ain Shams Engineering Journal, 10(3), 541-548.

Department of Statistics Malaysia (DOSM). (2023). https://open.dosm.gov.my/ms-MY/gdp. (Tarikh akses 11 Ogos 2023).

Dytczak, M., Ginda, G., Szklennik, N., & Wojtkiewicz, T. (2013). Weather influence-aware robust construction project structure. Procedia engineering, 57, 244-253.

Evseev, V., Barkhi, R., Pleshivtsev, A., & Scrynnik, A. (2019). Modeling the influence of weather and climatic conditions on the safety characteristics of the construction process. In E3S Web of Conferences (Vol. 97, p. 03035). EDP Sciences.

Galanaki, E., Lagouvardos, K., Kotroni, V., Flaounas, E., & Argiriou, A. (2018). Thunderstorm climatology in the Mediterranean using cloud-to-ground lightning observations. Atmospheric Research, 207, 136-144.

Halpin, D. (2005). Construction Management (3rd Ed.) Wiley, New York.

Hassan, N. S. B. A. (2018). The Impact of Weather Condition to Construction Project in Malaysia. http://umpir.ump.edu.my/id/eprint/27596/. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang. Tarikh akses 11 Oktober 2023.

Jung, M., Park, M., Lee, H. S., & Kim, H. (2016). Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of construction engineering and management, 142(6), 04016007.

Larsson, R., & Rudberg, M. (2019). Impact of weather conditions on in situ concrete wall operations using a simulation-based approach. Journal of Construction Engineering and Management, 145(7).

Larsson, R., & Rudberg, M. (2021). Effects of weather conditions on concrete work task productivity–a questionnaire survey. Construction Innovation. https://www. Emerald.com/insigt/1471-4175.htm.

Prayoga, T. W. F. (2019). Optimalisasi Pengamatan Cuaca dan Penentuan Prakiraan Cuaca Dalam Dunia Pelayaran di Wilayah Kerja BMKG Tanjung Emas Semarang. https://www.semanticscholar.org/author/Fajar-Prayoga/2133059223. Tarikh akses 31 Oktober 2023.

Ramli, M. Z., Nordin, A., Roslin, N. T., Hamid, N. B., Azman, N. S., & Zahari, N. M. (2019, July). Causes of construction delay for housing projects in Malaysia. In AIP Conference Proceedings (Vol. 2129, No. 1, p. 020030). AIP Publishing LLC.

Schuldt, S. J., Nicholson, M. R., Adams, Y. A., & Delorit, J. D. (2021). Weather-related construction delays in a changing climate: a systematic state-of-the-art review. Sustainability, 13(5), 2861.

Senouci, A., & Mubarak, S. (2014). Time-profit trade-off of construction projects under extreme weather conditions. Journal of Construction Engineering and Project Management, 4(4), 33-40.

Downloads

Published